-
Table of Contents
- Introduction
- Understanding Contractual Obligations
- Documenting Delays and Impacts
- Notifying the Other Party
- Reviewing the Contract Terms
- Seeking Legal Advice
- Negotiating Time Extensions
- Mitigating Damages
- Considering Alternative Dispute Resolution
- Enforcing Contractual Rights
- Reviewing Insurance Coverage
- Q&A
- Conclusion
“Navigating construction delays with legal expertise and strategic solutions.”
Introduction
Introduction:
Construction delays are a common occurrence in the industry and can have significant financial and legal implications for all parties involved. In order to effectively handle construction delays legally, it is important to have a clear understanding of your rights and responsibilities under the contract. This article will provide tips and strategies for navigating construction delays and protecting your interests in a legal manner.
Understanding Contractual Obligations
Construction projects are complex endeavors that involve multiple parties, tight deadlines, and a myriad of moving parts. Despite careful planning and coordination, delays can and do occur, causing frustration, financial losses, and potential legal disputes. Understanding your contractual obligations is crucial in navigating construction delays and ensuring that your rights are protected.
When entering into a construction contract, it is essential to carefully review and understand the terms and conditions outlined in the agreement. This includes the project timeline, milestones, payment schedule, and provisions related to delays. Most construction contracts include clauses that address delays, outlining the responsibilities of both parties in the event of unforeseen circumstances that impact the project timeline.
One common clause found in construction contracts is the “force majeure” clause, which excuses parties from performing their contractual obligations in the event of unforeseeable circumstances beyond their control, such as natural disasters, strikes, or government actions. If a delay is caused by a force majeure event, the party affected may be entitled to an extension of time to complete the project without facing penalties or liquidated damages.
In addition to force majeure clauses, construction contracts often include provisions related to delays caused by the actions or inactions of the parties involved. These clauses typically outline the procedures for notifying the other party of a delay, documenting the reasons for the delay, and seeking remedies or compensation for the impact on the project schedule.
If you are facing a construction delay, it is important to act promptly and in accordance with the terms of your contract. This may involve notifying the other party in writing of the delay, providing documentation to support your claim, and working collaboratively to find a solution that minimizes the impact on the project timeline and budget.
In some cases, disputes over construction delays may escalate to legal action. If negotiations fail to resolve the issue, parties may turn to mediation, arbitration, or litigation to seek a resolution. In these situations, having a clear understanding of your contractual obligations and rights is essential in presenting a strong case and protecting your interests.
When preparing for legal action related to construction delays, it is important to gather all relevant documentation, including the construction contract, project plans, correspondence with the other party, and any evidence of the delay and its impact on the project. This information will be crucial in supporting your claim and demonstrating that you have fulfilled your obligations under the contract.
In conclusion, handling construction delays legally requires a thorough understanding of your contractual obligations and rights. By carefully reviewing and adhering to the terms of your contract, promptly notifying the other party of any delays, and seeking remedies or compensation in accordance with the contract provisions, you can effectively navigate construction delays and protect your interests. In the event of a dispute, being prepared with documentation and a clear understanding of the legal process will help you present a strong case and achieve a favorable outcome.
Documenting Delays and Impacts
Construction projects are complex endeavors that often face delays due to various factors such as weather conditions, material shortages, design changes, or unforeseen site conditions. These delays can have a significant impact on the project timeline and budget, leading to disputes between the parties involved. In order to handle construction delays legally, it is crucial to document the delays and their impacts accurately and thoroughly.
One of the key strategies for handling construction delays is to maintain detailed records of the delays as they occur. This includes documenting the reasons for the delays, the duration of the delays, and the impact of the delays on the project schedule and budget. It is important to keep a daily log of all activities on the construction site, noting any delays or disruptions that occur. This documentation will serve as crucial evidence in case of a dispute and will help to establish the cause and effect relationship between the delays and their impacts.
In addition to maintaining daily logs, it is also important to communicate any delays to the other parties involved in the project in a timely manner. This includes notifying the owner, the architect, and any subcontractors or suppliers of the delays and their potential impacts. By keeping all parties informed of the delays, you can help to prevent misunderstandings and disputes down the line.
When documenting delays, it is important to be as specific and detailed as possible. This includes recording the exact dates and times of the delays, the reasons for the delays, and any additional costs or impacts that result from the delays. It is also important to take photographs or videos of the delays and their impacts, as visual evidence can be very persuasive in legal proceedings.
In addition to documenting the delays themselves, it is also important to document any efforts that were made to mitigate the delays and their impacts. This includes any changes to the project schedule or scope of work, any additional resources that were brought in to address the delays, and any costs that were incurred as a result of the delays. By documenting these efforts, you can demonstrate that you acted in good faith to address the delays and minimize their impacts.
In some cases, it may be necessary to issue formal notices of delay to the other parties involved in the project. These notices should clearly outline the reasons for the delays, the impacts of the delays, and any actions that are being taken to address the delays. By issuing formal notices of delay, you can protect your rights under the contract and ensure that the other parties are aware of the delays and their impacts.
In conclusion, documenting delays and their impacts is a crucial aspect of handling construction delays legally. By maintaining detailed records of the delays, communicating effectively with the other parties involved in the project, and taking proactive steps to address the delays, you can protect your rights and interests in case of a dispute. By following these tips and strategies, you can navigate construction delays effectively and minimize their impacts on your project.
Notifying the Other Party
Construction projects are complex endeavors that involve multiple parties working together to achieve a common goal. However, delays are a common occurrence in the construction industry and can have significant impacts on the project timeline and budget. When faced with construction delays, it is important to handle them in a timely and professional manner to minimize their impact on the project. In this article, we will discuss how to handle construction delays legally, focusing on the importance of notifying the other party.
One of the first steps in addressing construction delays is to notify the other party involved in the project. Whether you are the contractor, subcontractor, or owner, it is crucial to communicate any delays as soon as they are identified. This allows all parties to assess the situation and work together to find a solution that minimizes the impact on the project.
When notifying the other party of a construction delay, it is important to provide detailed information about the cause of the delay, the expected duration, and any potential impacts on the project timeline and budget. This information allows the other party to understand the situation fully and make informed decisions about how to proceed.
In addition to providing detailed information about the delay, it is also important to document all communications related to the delay. This includes keeping a record of all emails, letters, and phone calls exchanged with the other party regarding the delay. This documentation can be crucial in the event of a dispute and can help protect your interests legally.
When notifying the other party of a construction delay, it is also important to consider the terms of the contract. Many construction contracts include provisions related to delays, outlining the responsibilities of each party in the event of a delay. By reviewing the contract terms, you can ensure that you are following the proper procedures for notifying the other party of a delay and can help protect your legal rights.
In some cases, the contract may require that certain notice provisions be followed when notifying the other party of a delay. These provisions may include specific timelines for providing notice or requirements for the format of the notice. By following these provisions, you can ensure that your notice is legally valid and can help protect your interests in the event of a dispute.
In addition to notifying the other party of a construction delay, it is also important to consider potential strategies for addressing the delay. This may include negotiating a revised schedule, seeking additional resources to expedite the work, or pursuing a claim for additional time or compensation. By exploring these strategies, you can work towards resolving the delay in a way that minimizes its impact on the project.
In conclusion, handling construction delays legally requires effective communication and documentation. By notifying the other party of a delay in a timely and professional manner, you can work towards finding a solution that minimizes the impact on the project. By following the contract terms and considering potential strategies for addressing the delay, you can protect your legal rights and interests in the event of a dispute.
Reviewing the Contract Terms
Construction projects are complex endeavors that often involve multiple parties, tight deadlines, and unforeseen challenges. One of the most common issues that can arise during a construction project is delays. Delays can be caused by a variety of factors, including weather, material shortages, labor disputes, or design changes. When faced with construction delays, it is important to understand how to handle them legally to protect your interests and ensure that the project is completed in a timely manner.
The first step in handling construction delays legally is to review the contract terms. The construction contract is a legally binding document that outlines the rights and responsibilities of all parties involved in the project. It is important to carefully review the contract to understand what remedies are available in the event of delays. The contract may include provisions for extensions of time, liquidated damages, or other remedies for delays.
If the contract does not adequately address delays, it may be necessary to negotiate a modification to the contract. This can be done through a formal change order process, in which the parties agree to amend the contract to address the delays. It is important to document any changes to the contract in writing to avoid disputes later on.
In some cases, it may be necessary to seek legal advice to determine the best course of action for handling construction delays. An experienced construction attorney can review the contract terms, assess the impact of the delays on the project, and advise on the best strategies for resolving the issue. Legal counsel can also help negotiate with the other parties involved in the project to reach a resolution that is fair and equitable for all parties.
In addition to reviewing the contract terms, it is important to document the delays and their impact on the project. Keeping detailed records of the delays, including the reasons for the delays, the length of the delays, and any additional costs incurred as a result of the delays, can help support your case in the event of a dispute. It is also important to communicate regularly with the other parties involved in the project to keep them informed of the delays and work together to find solutions.
When faced with construction delays, it is important to remain proactive and take steps to address the issue as soon as possible. By reviewing the contract terms, seeking legal advice if necessary, and documenting the delays, you can protect your interests and ensure that the project is completed in a timely manner. Handling construction delays legally requires careful attention to detail and a proactive approach to resolving the issue. By following these tips and strategies, you can navigate construction delays effectively and protect your rights as a party to the project.
Seeking Legal Advice
Construction projects are complex endeavors that involve multiple parties, tight deadlines, and a myriad of moving parts. Despite careful planning and coordination, delays can and do occur, causing frustration, financial losses, and potential legal disputes. When faced with construction delays, it is crucial to understand your legal rights and options to protect your interests and seek appropriate remedies.
One of the first steps in handling construction delays legally is to review your contract thoroughly. Most construction contracts contain provisions that address delays, including the allocation of responsibility, procedures for notifying the other party, and mechanisms for resolving disputes. By understanding the terms of your contract, you can determine your rights and obligations in the event of a delay.
If a delay occurs, it is essential to document the delay promptly and accurately. This includes keeping detailed records of the delay, its causes, and its impact on the project schedule and budget. By maintaining thorough documentation, you can support your claim for compensation or other remedies in the event of a dispute.
When faced with a construction delay, it is important to communicate with the other parties involved in the project. Open and honest communication can help prevent misunderstandings and disputes from escalating. By discussing the delay with the other party, you may be able to reach a mutually acceptable solution without resorting to legal action.
If informal negotiations fail to resolve the delay, you may need to consider seeking legal advice. Construction delays can have significant financial implications, and it is important to protect your interests by consulting with a qualified construction attorney. An experienced attorney can review your contract, assess your legal options, and help you navigate the complex legal landscape of construction delays.
When seeking legal advice for construction delays, it is important to choose an attorney with expertise in construction law. Construction law is a specialized area of law that involves unique legal principles and regulations. By working with an attorney who understands the intricacies of construction law, you can ensure that your rights are protected and that you receive the best possible legal representation.
In addition to seeking legal advice, you may also need to consider alternative dispute resolution mechanisms, such as mediation or arbitration. These methods can help parties resolve disputes more efficiently and cost-effectively than traditional litigation. By exploring alternative dispute resolution options, you may be able to reach a resolution more quickly and with less expense.
In conclusion, construction delays are a common challenge in the construction industry, but they can be managed effectively with the right legal strategies. By reviewing your contract, documenting the delay, communicating with the other parties, seeking legal advice, and exploring alternative dispute resolution options, you can protect your interests and seek appropriate remedies for construction delays. With careful planning and proactive legal action, you can navigate construction delays successfully and minimize their impact on your project.
Negotiating Time Extensions
Construction projects are complex endeavors that often face delays due to various factors such as weather conditions, material shortages, design changes, or unforeseen site conditions. These delays can have a significant impact on the project timeline and budget, leading to disputes between the parties involved. In such situations, it is crucial to handle construction delays legally to protect your interests and ensure a successful project completion.
One of the key strategies for dealing with construction delays is negotiating time extensions. Time extensions allow the contractor to complete the project within a reasonable timeframe without facing penalties for delays beyond their control. However, obtaining time extensions can be a challenging process that requires careful negotiation and documentation.
When negotiating time extensions, it is essential to first review the contract documents to understand the provisions related to delays and extensions. The contract should outline the procedures for requesting time extensions, the circumstances under which extensions can be granted, and the documentation required to support the request. By familiarizing yourself with the contract terms, you can effectively navigate the negotiation process and protect your rights under the agreement.
Once you have reviewed the contract documents, you should gather evidence to support your request for a time extension. This evidence may include weather reports, correspondence with suppliers, change orders, and any other documentation that demonstrates the cause of the delay and its impact on the project schedule. By presenting a comprehensive case with supporting evidence, you can strengthen your position and increase the likelihood of obtaining a favorable outcome in the negotiation process.
When presenting your request for a time extension, it is important to communicate clearly and professionally with the other party. Clearly outline the reasons for the delay, the impact on the project schedule, and the proposed duration of the extension. Be prepared to answer any questions or concerns raised by the other party and be willing to negotiate in good faith to reach a mutually acceptable solution.
During the negotiation process, it is crucial to keep detailed records of all communications and agreements reached. Documenting the discussions, decisions, and outcomes of the negotiation can help protect your interests in case of disputes or disagreements later on. By maintaining accurate records, you can ensure that both parties are held accountable for their commitments and obligations under the contract.
In some cases, the negotiation process may reach an impasse, and the parties may need to seek alternative dispute resolution methods to resolve the issue. Mediation or arbitration can provide a neutral third party to help facilitate discussions and reach a resolution that is acceptable to both parties. By engaging in alternative dispute resolution, you can avoid costly and time-consuming litigation and find a more efficient way to resolve the delay issue.
In conclusion, negotiating time extensions is a critical aspect of handling construction delays legally. By understanding the contract terms, gathering evidence, communicating effectively, and documenting the negotiation process, you can increase the likelihood of obtaining a time extension that protects your interests and ensures the successful completion of the project. By following these tips and strategies, you can navigate the complexities of construction delays and safeguard your rights under the contract.
Mitigating Damages
Construction delays are a common occurrence in the industry, and they can have significant financial and legal implications for all parties involved. When faced with a delay, it is important to understand how to handle the situation legally in order to protect your interests and mitigate damages. In this article, we will discuss some tips and strategies for handling construction delays in a legal manner.
One of the first steps to take when faced with a construction delay is to review the contract that governs the project. The contract will typically outline the rights and responsibilities of each party in the event of a delay, including any provisions for extensions of time or compensation for delays. It is important to carefully review these provisions to determine your rights and obligations under the contract.
If the delay is the result of a breach of contract by the other party, it may be necessary to take legal action to enforce your rights. This could involve filing a lawsuit for breach of contract or seeking arbitration or mediation to resolve the dispute. It is important to consult with a qualified construction attorney to determine the best course of action in your particular situation.
In some cases, it may be possible to negotiate a resolution to the delay without resorting to legal action. This could involve working with the other party to come to a mutually acceptable solution, such as extending the deadline for completion of the project or adjusting the scope of work to account for the delay. It is important to document any agreements reached in writing to avoid misunderstandings or disputes later on.
Another important consideration when dealing with construction delays is the concept of mitigating damages. This means taking steps to minimize the financial impact of the delay on your business. This could involve taking steps to accelerate the project schedule, reallocating resources to other projects, or seeking alternative sources of funding to cover the costs of the delay.
It is also important to keep detailed records of the delay, including the reasons for the delay, the impact on the project schedule and budget, and any communications with the other party regarding the delay. This documentation will be important in the event that legal action becomes necessary, as it will help to support your case and demonstrate the extent of the damages suffered as a result of the delay.
In conclusion, construction delays can have serious legal and financial implications for all parties involved. It is important to understand your rights and obligations under the contract, and to take steps to protect your interests in the event of a delay. By following the tips and strategies outlined in this article, you can help to mitigate the damages caused by a construction delay and protect your business from unnecessary financial losses.
Considering Alternative Dispute Resolution
Construction delays are a common occurrence in the industry, and they can have significant impacts on a project’s timeline and budget. When faced with delays, it is important for all parties involved to handle the situation in a professional and legal manner. One option for resolving construction delays is through alternative dispute resolution (ADR) methods. ADR can help parties avoid costly and time-consuming litigation, and can often lead to a more amicable resolution of disputes.
One of the most common forms of ADR used in construction disputes is mediation. Mediation involves a neutral third party, known as a mediator, who helps facilitate discussions between the parties to reach a mutually acceptable resolution. Mediation is a voluntary process, and the parties are not bound by the mediator’s decision. However, if an agreement is reached, it can be legally binding.
Another form of ADR that is often used in construction disputes is arbitration. Arbitration is a more formal process than mediation, and involves a neutral third party, known as an arbitrator, who acts as a judge and makes a binding decision on the dispute. Arbitration can be either binding or non-binding, depending on the agreement of the parties involved. While arbitration can be a quicker and less expensive alternative to litigation, parties should be aware that the arbitrator’s decision is final and cannot be appealed.
When considering ADR for construction delays, it is important for parties to carefully review their contracts to determine if there are any provisions that require or allow for ADR. Many construction contracts include clauses that require parties to attempt mediation or arbitration before pursuing litigation. Parties should also consider the costs and benefits of ADR compared to litigation, and whether they believe that a more collaborative approach to resolving the dispute would be beneficial.
In addition to mediation and arbitration, there are other forms of ADR that can be used to resolve construction delays. These include negotiation, conciliation, and expert determination. Each of these methods has its own advantages and disadvantages, and parties should carefully consider which method would be most appropriate for their particular situation.
Regardless of the form of ADR chosen, parties should approach the process in good faith and be willing to engage in open and honest discussions to reach a resolution. It is important for parties to come prepared with all relevant information and documentation to support their position, and to be willing to listen to the other party’s perspective.
In conclusion, ADR can be a valuable tool for resolving construction delays in a timely and cost-effective manner. By considering the various forms of ADR available and carefully reviewing their contracts, parties can determine the best approach for resolving their dispute. By approaching ADR with a collaborative mindset and a willingness to engage in open and honest discussions, parties can increase the likelihood of reaching a mutually acceptable resolution.
Enforcing Contractual Rights
Construction projects are complex endeavors that involve multiple parties, tight deadlines, and a myriad of moving parts. Despite careful planning and coordination, delays can and do occur, causing frustration, financial losses, and disputes among stakeholders. When faced with construction delays, it is crucial to understand your legal rights and options for recourse. In this article, we will discuss tips and strategies for handling construction delays legally, focusing on enforcing contractual rights.
One of the first steps in addressing construction delays is to review the terms of your contract. Contracts typically include provisions that address delays, such as liquidated damages clauses, time extensions, and dispute resolution mechanisms. It is important to carefully review these provisions to understand your rights and obligations in the event of a delay. If the delay is caused by a party’s breach of contract, you may be entitled to seek remedies such as damages or termination of the contract.
When faced with a construction delay, communication is key. It is important to keep all parties informed of the delay, its causes, and its impact on the project schedule and budget. Open and honest communication can help prevent misunderstandings and disputes, and may even lead to a collaborative resolution of the delay. Documenting all communications related to the delay is also crucial, as it can serve as evidence in any potential legal proceedings.
If informal negotiations fail to resolve the delay, you may need to consider more formal legal action. This may involve initiating a dispute resolution process specified in the contract, such as mediation, arbitration, or litigation. These processes can be time-consuming and costly, but they may be necessary to protect your legal rights and interests. It is important to consult with legal counsel to determine the best course of action based on the specific circumstances of the delay.
In pursuing legal action for a construction delay, it is important to gather and preserve evidence to support your claims. This may include project documentation, correspondence, witness statements, and expert reports. Evidence of the causes of the delay, its impact on the project, and any resulting damages will be crucial in proving your case. It is also important to comply with any procedural requirements specified in the contract or applicable laws to ensure that your legal claims are not barred by technicalities.
When seeking legal remedies for a construction delay, it is important to be realistic about the potential outcomes. While you may be entitled to damages or other remedies under the contract, the legal process can be unpredictable and may not always result in a favorable outcome. It is important to weigh the costs and benefits of pursuing legal action, taking into account the potential time, expense, and uncertainty involved.
In conclusion, handling construction delays legally requires a thorough understanding of your contractual rights and options for recourse. By reviewing the terms of your contract, communicating effectively with all parties, and seeking legal advice when necessary, you can navigate the complexities of construction delays and protect your legal interests. While legal action may be necessary in some cases, it is important to approach the situation with a clear understanding of the risks and potential outcomes. By following these tips and strategies, you can effectively address construction delays and minimize their impact on your project.
Reviewing Insurance Coverage
Construction delays are a common occurrence in the industry, and they can have significant financial implications for all parties involved. When faced with delays, it is important to understand your rights and responsibilities under the contract and to consider all available options for resolving the issue. One important aspect to consider when dealing with construction delays is insurance coverage.
Insurance coverage can play a crucial role in mitigating the financial impact of construction delays. It is important to review your insurance policies carefully to determine what coverage is available and how it can be used to address delays. There are several types of insurance that may be relevant in the context of construction delays, including builder’s risk insurance, general liability insurance, and professional liability insurance.
Builder’s risk insurance is a type of property insurance that covers damage to a construction project during the course of construction. This type of insurance typically covers losses caused by events such as fire, theft, vandalism, and certain natural disasters. In the event of a construction delay caused by covered damage, builder’s risk insurance may provide coverage for the resulting costs, such as additional labor and materials needed to complete the project.
General liability insurance is another important type of insurance that may come into play in the context of construction delays. This type of insurance provides coverage for bodily injury and property damage claims arising out of the construction project. In the event that a delay leads to a claim against the contractor or other parties involved in the project, general liability insurance may provide coverage for legal defense costs and any damages awarded in a lawsuit.
Professional liability insurance, also known as errors and omissions insurance, is designed to protect professionals such as architects, engineers, and contractors from claims alleging negligence or errors in their work. In the event that a delay is caused by a mistake or oversight on the part of a professional involved in the project, professional liability insurance may provide coverage for resulting costs, such as redesign and rework.
When reviewing insurance coverage in the context of construction delays, it is important to carefully review the terms and conditions of the policies to understand what is covered and what is excluded. It is also important to notify your insurance carrier promptly in the event of a delay to ensure that you comply with any notice requirements under the policy.
In addition to reviewing insurance coverage, there are several strategies that can be employed to handle construction delays effectively. One important strategy is to document the delay carefully, including the cause of the delay, the impact on the project schedule and budget, and any efforts made to mitigate the delay. This documentation can be crucial in resolving disputes with other parties involved in the project and in seeking coverage under insurance policies.
Another important strategy is to communicate effectively with all parties involved in the project, including the owner, contractors, subcontractors, and insurance carriers. Keeping all parties informed of the status of the project and any delays that arise can help to prevent misunderstandings and disputes and can facilitate a collaborative approach to resolving the issue.
In conclusion, insurance coverage can be a valuable tool for addressing construction delays, but it is important to review your policies carefully and to understand what is covered. By documenting delays carefully, communicating effectively with all parties involved, and seeking coverage under insurance policies when appropriate, you can effectively handle construction delays and minimize their financial impact.
Q&A
1. What is a construction delay?
A construction delay is any unexpected event or circumstance that causes a project to be completed later than originally planned.
2. What are common causes of construction delays?
Common causes of construction delays include weather conditions, design changes, material shortages, labor shortages, and unforeseen site conditions.
3. How can construction delays be avoided?
Construction delays can be avoided by carefully planning the project, setting realistic timelines, and addressing potential issues early on. Clear communication between all parties involved is also essential.
4. What legal remedies are available for construction delays?
Legal remedies for construction delays may include liquidated damages clauses, extensions of time, and claims for additional costs incurred due to the delay.
5. How can contractors protect themselves from construction delays?
Contractors can protect themselves from construction delays by including delay clauses in their contracts, documenting all delays and their causes, and following proper procedures for notifying the other parties involved.
6. What should be included in a delay claim?
A delay claim should include a detailed explanation of the delay, the impact it had on the project, and any additional costs incurred as a result of the delay.
7. How can construction delays be resolved through mediation or arbitration?
Construction delays can be resolved through mediation or arbitration by bringing in a neutral third party to help facilitate discussions and reach a resolution outside of court.
8. What are the benefits of resolving construction delays through mediation or arbitration?
Resolving construction delays through mediation or arbitration can be faster, less expensive, and less adversarial than going to court.
9. What are the risks of not addressing construction delays legally?
Not addressing construction delays legally can result in financial losses, damaged relationships between parties, and potential legal disputes down the line.
10. What steps should be taken to handle construction delays legally?
To handle construction delays legally, parties should review their contracts, document all delays and their causes, notify the other parties involved in a timely manner, and seek legal advice if necessary.
Conclusion
In conclusion, handling construction delays legally requires a proactive approach, clear communication, and documentation of all delays and impacts. It is important to review contracts, understand legal rights and obligations, and seek legal advice when necessary to protect your interests and mitigate potential disputes. By following these tips and strategies, construction delays can be managed effectively and resolved in a timely manner.